Our website uses cookies to help provide you with the best experience tailored to your interests. To use the website with full comfort, please accept to receive all cookies on our website. For more information with regard to Cookies please see our Privacy policy.

Accept Decline

Commercial Systems case studies

Maiden Erlegh School

Maiden Erlegh School was in need of a new, more efficient heating and hot water system. After consulting with Hydro Heating Solutions, twelve Vaillant ecoTEC 120kW wall-hung boilers were installed to replace the old atmospheric natural gas boilers.

Read more (238 kB)

Clarks shoes

Clarks’ distribution centre in Kendal was relying on two particularly outdated boilers, one estimated to be 46 years old, the other 32 years old. The project consisted of installing six Vaillant ecoCRAFT 280kW floor standing condensing boilers, to produce a total output of 1,680kW. This resulted in seasonal efficiency improvements of over 25%.

Read more (192 kB)

Duncan Edwards

Duncan Edwards Court opted for a Vaillant integrated hybrid renewables system consisting of an auroTHERM solar thermal array on the roof and two 22kW geoTHERM ground source heat pumps. In addition, an ecoTEC plus 438 boiler provides a back-up and ensures the system is pasteurised weekly, raising the temperature from 56 to 65°C for an hour.

Read more (198 kB)